The Working YardJonathan Mercer · San Fernando Valley
The journal

The gate swings the other way

This estimate looked straightforward until we tried to put everything back where the owner wanted it. The gate opened into the very space where she hoped to stand a row of containers.

We moved the empty ones into position temporarily and opened the gate fully. That made the problem easier to see than talking about it from the other side. One container needed to move before the gate could pass. Another left too little room to carry anything through comfortably.

She tried a shorter row along the wall. We opened and shut the gate again and walked through with the bucket. That arrangement left a usable passage. I wrote down the position she preferred and described the cleaning work separately.

When I came back for the visit, the row was already in place. I worked around it, gathered the loose material from the paved corners, and tested the gate once more before finishing. No hardware or construction work was involved.

She came out to check the arrangement with a basket in her arms. That was what she usually carried through the gate. The bucket had been a useful test, but hers was better.